Frequently Asked QuestionsQuestions clarified before technical review
Core answers on capacity, duty, installation, maintenance, spare parts and project planning.
What information is required for a crane quotation?+
Rated load, span, lifting height, operating area, daily cycles, load type, power supply, site location and photographs are the key starting data.
Should I choose a single-girder or double-girder overhead crane?+
The decision depends on span, capacity, headroom, hook approach, duty class and maintenance access. Tonnage alone is not sufficient.
Can an existing crane be modernized?+
Yes, when the supporting structure and main mechanical components remain suitable. Controls, drives, brakes, limits and safety functions can be renewed after technical assessment.
Do you provide service throughout Türkiye?+
Engineering, manufacturing, installation, maintenance, modernization and spare parts support are planned for industrial sites throughout Türkiye.
Do you undertake international projects?+
Yes. Technical specifications, logistics, installation conditions, local requirements and commissioning scope are reviewed before acceptance.
Which photographs should be sent for a breakdown request?+
Send the complete equipment view, faulty area, motor and gearbox nameplates, control panel, error display and a short video of the symptom when safe.
How often should a crane be maintained?+
Intervals depend on duty class, cycles, environment, load spectrum and manufacturer instructions. Legal periodic inspection and preventive maintenance are separate processes.