Endüstriyel Kaldırma SistemleriMühendislik, üretim ve servis tek teknik merkezde
Industrial crane engineering across Türkiye and international marketsEngineering, manufacturing, installation, commissioning, maintenance and modernizationOverhead, gantry, monorail, jib, hoist and process lifting systemsTechnical service, fault diagnostics, planned maintenance and spare-parts support
Engineering and Service

The complete crane lifecycle

A single technical responsibility from survey, engineering, manufacturing and installation to maintenance, diagnostics, modernization and spare parts.

Crane technical service
08
Technical Service

Crane Condition Assessment

A structured assessment of mechanical, electrical, structural, safety and maintenance-history data to support maintenance, modernization or replacement decisions.

Explore service
Crane Condition Assessment
09
Technical Service

Crane Service Programs

A service approach structured from on-demand response to planned maintenance and condition-based improvement according to equipment criticality and production rhythm.

Explore service
Crane Service Programs
Service Lifecycle

From reactive response to planned improvement

Service level is structured around asset criticality, duty and production impact.

01

On-demand response

Breakdown data, safe shutdown and initial fault scope

02

Planned maintenance

Task list adjusted to duty, history and access

03

Condition assessment

Prioritized findings for risk, reliability and future action

04

Modernization roadmap

Feasibility for controls, mechanics, structure and process changes

Frequently Asked Questions

Questions clarified before technical review

Core answers on capacity, duty, installation, maintenance, spare parts and project planning.

What information is required for a crane quotation?+

Rated load, span, lifting height, operating area, daily cycles, load type, power supply, site location and photographs are the key starting data.

Should I choose a single-girder or double-girder overhead crane?+

The decision depends on span, capacity, headroom, hook approach, duty class and maintenance access. Tonnage alone is not sufficient.

Can an existing crane be modernized?+

Yes, when the supporting structure and main mechanical components remain suitable. Controls, drives, brakes, limits and safety functions can be renewed after technical assessment.

Do you provide service throughout Türkiye?+

Engineering, manufacturing, installation, maintenance, modernization and spare parts support are planned for industrial sites throughout Türkiye.

Do you undertake international projects?+

Yes. Technical specifications, logistics, installation conditions, local requirements and commissioning scope are reviewed before acceptance.

Which photographs should be sent for a breakdown request?+

Send the complete equipment view, faulty area, motor and gearbox nameplates, control panel, error display and a short video of the symptom when safe.

How often should a crane be maintained?+

Intervals depend on duty class, cycles, environment, load spectrum and manufacturer instructions. Legal periodic inspection and preventive maintenance are separate processes.

How are crane spare parts matched?+

Brand and model are checked together with dimensions, connections, electrical ratings, capacity, reduction ratio and field photographs.

Direct Contact with Engineering

Let us review the load, site and objective together

Send a structured request for a new crane, modernization, maintenance, fault or spare parts.