Endüstriyel Kaldırma SistemleriMühendislik, üretim ve servis tek teknik merkezde
Industrial crane engineering across Türkiye and international marketsEngineering, manufacturing, installation, commissioning, maintenance and modernizationOverhead, gantry, monorail, jib, hoist and process lifting systemsTechnical service, fault diagnostics, planned maintenance and spare-parts support
Crane Engineering Centre

Calculators and technical decision centre

These tools provide a consistent starting point for capacity, hoisting power, cycle time, approximate wheel load and duty intensity before the site review.

Crane engineering calculations

Preliminary rated capacity

Suggests the next rated capacity using load, lifting attachment and dynamic allowance.

Enter values to begin.

Preliminary hoisting motor power

Calculates theoretical power from moving mass, lifting speed and mechanical efficiency.

Enter values to begin.

Approximate cycle time

Combines lifting, travel and dwell periods into one operating cycle.

Enter values to begin.

Approximate wheel-load distribution

Distributes lifted load, bridge and trolley mass across wheels for preliminary structural review.

Enter values to begin.

Preliminary duty profile

Profiles operating intensity using daily hours, cycles per hour and average load ratio.

Enter values to begin.
Engineering validation is mandatory

Results are preliminary and do not replace engineering. Structural capacity, fatigue, mechanism classification, acceleration, braking, wind, seismic effects, temperature, misuse and applicable regulations are outside these simplified tools.

Load spectrum

How often the crane lifts light, medium and near-rated loads determines fatigue demand.

Duty cycle

Operating hours and cycles influence motors, brakes, reducers, ropes and structural life.

Facility interface

Runway alignment, structural stiffness, power supply and access affect reliable operation.

Safety functions

Overload protection, limits, emergency stop, brakes and controls must work as a coordinated system.

Direct Contact with Engineering

Let us review the load, site and objective together

Send a structured request for a new crane, modernization, maintenance, fault or spare parts.