Site and system are evaluated together
A hybrid crane configuration with one side supported by a building runway and the other by a leg travelling on a floor rail.
Capacity, span, lift height, duty cycle, structure, power supply, installation access and maintenance strategy are validated within the project scope.
Technical scope
- Site dimensions and existing structure review
- System type, duty intensity and speed selection
- Electrical, control, brake and safety functions
- Installation, commissioning, records and maintenance plan


