Configuration around actual operating conditions
Drum geometry, rope reeving, braking, motor power, gearbox ratio, lifting speed and duty class are selected together. Maintenance access and critical spare part strategy are included in the technical review.
Final capacity, structural loads, duty class, speeds, braking, limits, power supply and site interfaces are confirmed through approved engineering.





